CPWG was contracted to supplement Dade City Pavement Management Services. Our team provided continuing pavement management services for their 43 centerline mile roadway network. Through these services a field inventory review and ASTM D6433-11 inspection of pavement was performed on all 614 management sections within the network. All inventory changes were updated within the PAVER database and an updated PCI was calculated for each section.
During the inspection process, a digital image was taken at each sample location. This allows for a visual identification as to what types of distresses are occurring within the pavement section. These digital images were then linked within the PAVER database to allow for fast image retrieval. In addition to linking the images within PAVER, CPWG also provided a fully indexed DVD containing these digital images.
CPWG Pavement Management Program.
The PAVER Pavement Management Software defines the pavement network in terms of “Branches” and “Sections”. The City of Dade City Roadways Network consists of all maintained roadways within the agency, each roadway broke down into management sections on a block by block basis. Within each management section, the total number of possible sample locations is first determined, and then approximately 10% of these samples are inspected following ASTM D6433.
CPWG highly trained Pavement Inspectors use our manual “boots on the ground” ASTM D6433-11 inspection process to identify all distress information for each sample location. The information is then recorded into the PAVERTM database for Pavement Condition Index (PCI) calculation. The final result is a PCI score for each management section.
The CPWG team worked with City engineers to update the City of Dade City Pavement Management program using the PAVER software package. Our team developed and set up the PAVER custom system tables. The system tables provided the City specific variables that are used by the software to aid in the production of Condition Analysis and M&R Planning reports. Examples include the development of a pavement model, maintenance costs, etc. A core maintenance and pavement preservation strategy was defined as well as the goal plan number of years and budget. Various scenarios were produced against the maintenance strategies employed, conditions to achieve, and budgets specified.
SKILLS
Pavement Management
ASTM D6433-11 Inspection
GIS Setup and Linking
PAVER Database
PAVER Custom System Tables
Condition Analysis Report
Pavement Management Program
Sample Roadway Network PCI Map