St Joseph Apartments Civil Site Design

Orlando, FL
CPWG Designed St Joseph Apartments Civil Site

CPWG designed civil site for the St. Joseph Garden Courts apartments in Orlando, FL.

CPWG Designed St Joseph Apartments Civil Site

CPWG Final Construction Plans Included

  • Overall Site Design
  • Connections to County Water
  • Connections to County Wastewater
  • Retrofit existing Stormwater Pond
  • Lift Station Design
  • Grading and Drainage
  • Relocation of the Existing Entry Drive
  • An Additional Entry Gate
CPWG Designed St Joseph Apartments Civil Site

CPWG Specialists Prepared and Submitted

  • SJRWMD Drainage Permit
  • Florida DEP Potable Water Permit
  • Florida DEP Wastewater Permit
  • All Supporting Calculations, Maps and Figures
CPWG Designed St Joseph Apartments Civil Site

CPWG Resident Experts Assisted the Client By

  • Assisting with Bid Solicitation
  • Assisting in Bid Review
  • Making Recommendations
  • Preparing Construction Contract Agreement
  • Preparing Notice-To-Proceed

St Joseph Apartments Civil Site Design

Orlando, FL

Catholic Charities of Central Florida employed CPWG to design the St Joseph Garden Courts apartments in located in Orlando, FL.  The project was to build a $10 million, 80-unit apartment, affordable rental complex for those age 62 and older.  CPWG was responsible for the preliminary site plan, stormwater plan, parking plan, signing and pavement markings, environmental permits and construction phase administrative services.

Construction Plans

CPWG prepared the plans used by the contractor to build the civil portion of the project.  Our engineers coordinated with a geotechnical engineering company to obtain soil boring and soil investigation information as required by the County, St. Johns River Water Management District (SJRWMD), and design needs.  The team assigned conducted field reconnaissance at the project site to observe existing features. The final construction plans included the following:

  • Overall Site Design
  • Connections to County Water and Wastewater Services
  • Retrofit existing Stormwater Pond
  • Lift Station Design
  • Grading and Drainage
  • Relocated the Existing Entry Drive
  • Added an Entry Gate

Permitting

CPWG specialists prepared the supporting calculations, maps and figures required for the SJRWMD permit application.  To speed the approval process they attended a pre-application meeting with the SJRWMD.  Florida Department of Environmental Protection (DEP) Potable Water and DEP Wastewater permits were prepared and submitted.

Construction Stage Services

CPWG resident experts assisted the Catholic Charities of Central Florida with obtaining quotes or bid solicitation, assisted in bid review and made recommendations as required.  They also prepared the construction contract agreement and notice-to-proceed.   CPWG assisted the client’s staff in administering the construction phase by performing periodic construction observations of roads, parking, and drainage and performed water system and sewer system observation of construction for FDEP certification.

SKILLS

Client Assistance: Bid Solicitation

Client Assistance: Bid Review

Client Assistance: Bid Selection

Construction Administration

Design: Civil Site

Design: Stormwater Management System

Permitting: Drainage

Permitting: Environmental Resource

Permitting: Water

Sustainability-driven Planning

Value Engineering

CPWG employed to develop a Courthouse area pedestrian circulation plan

St Joseph Apartments Groundbreaking 

CPWG Designed St Joseph Apartments Civil Site