East Orange Neighborhood Park

Orange County, FL
CPWG Engineer Designed the East Orange Neighborhood Park in Orange County

CPWG Engineer Designed the East Orange Neighborhood Par

CPWG Engineer Designed the East Orange Neighborhood Park in Orange County

Park Amenities Include

  • A Tot-Lot
  • Big Kids Playground
  • Sports Courts/Fields
  • Small Pavilions
  • Long Walk Trail
CPWG Engineer Designed the East Orange Neighborhood Park in Orange County

Services Provided Included

  • Construction Plans
  • Bidding Services
  • Construction Administration
  • Bidding Services
  • Landscape Architecture
CPWG Engineer Designed the East Orange Neighborhood Park in Orange County

Adult Recreational Facilities

  • Picnic Pavilions
  • Bleachers
  • Benches
  • Area Lighting
  • Restroom Facilities

East Orange Neighborhood Park

Orange County, FL

CPWG Engineer Jeff Earhart assisted Orange County in developing the East Orange Neighborhood Park adjacent to a head start program and a library. The amenities at the park include tot-lot, big kids playground, basketball court, little league baseball field, large and small pavilions, restroom facilities, long walk trail through wetland type areas, landscaping and other features. The infrastructure design included: site grading, stormwater design and permitting, potable water design and permitting, wastewater system design, roadway and parking design, and wetland issues

Construction Plans and Specifications:  Staff performed all necessary design, analysis, and production of construction plans for the project civil site, irrigation, and site lighting elements. Drawing production was completed in AutoCAD format. Staff prepared project specifications and special provisions for project bidding.

Permitting Services:  Staff coordinated meetings with permit agencies. Permits were obtained from the St. Johns River Water Management District (SJRWMD), Florida Department of Environmental Protection (DEP) and Orange County Building Department to construct the project. We also performed site studies for wildlife impacts and handled Gopher Tortoise issues.

Bidding Services:  Mr. Earhart prepared and reviewed all bidding documents and specifications for the project. Staff also assisted the County with bid solicitation, responding to bidder questions, reviewed of all bids received and provided a selection recommendation to the County.

Construction Administration Services: Staff provided construction administration services, site inspections, utility company coordination, site meeting attendance, review of shop drawings, and review of pay requests.

Design/Layout of Landscape Planting Elements: A landscaping plan around the playground, walking path and perimeter fencing was critical to the integration of the park with the community.

Irrigation System: Staff designed a fully operations automatic irrigation system to service the ball fields and the surrounding area. Irrigation system design and electrical system design were coordinated with Mary Bates and Bobes Associates, respectively.

Playground/Picnic Pavilions: The interrelationship between the location of adult recreational facilities, parking areas, and children playground areas was conducted. Picnic Pavilions, bleachers, benches and area lighting areas were designed to provide adequate site drainage. The entire layout of the East Orange Neighborhood Park system was planned, coordinated and laid-out.

SKILLS

Client Assistance: Bid Review

Client Assistance: Bid Selection

Client Assistance: Bid Solicitation

Client Assistance: Bid Specifications

Construction Administration

Design: Eco-Focused Landscape

Design: Irrigation

Design: Playground

Permitting: Environmental Resource

Permitting: Construction

CPWG employed to develop a Courthouse area pedestrian circulation plan

CPWG Engineer Designed the East Orange Neighborhood Park in Orange County