Astatula Park Boat Ramp

Astatula, FL
CPWG Designed Astatula Park Boat Ramp

CPWG was engaged by Lake County to design a boat ramp in Asatula, Florida.

CPWG Designed Astatula Park Boat Ramp

CPWG Civil Engineering Construction Plans Included:

  • 60% Civil Plans, Specification, and Cost Estimate
  • 90% Civil Plans, Specification, and Cost Estimate
  • 100% Civil Plans, Specifications, and Cost Estimate
  • Astatula Boat Ramp Final Plans
CPWG Designed Astatula Park Boat Ramp

CPWG Designed Improvements Included:

  • 40 Foot Floating Dock
  • Prefabricated Restroom
  • Paved Parking Area
  • SJRWMD Stormwater Permitting
CPWG Designed Astatula Park Boat Ramp

CPWG Coordinated With Lake County Staff

  • Kick-Off Meeting
  • Two Design Review Meetings
  • SJRWMD ERP Permit Meeting

Astatula Park Boat Ramp Design

Astatula, FL

CPWG was engaged to assist Lake County Official’s efforts to construct a boat ramp in Asatula, Florida.  CPWG Engineers were responsible for construction documents and preparation of the St. Johns River Water Management District (SJRWMD) Permit or Exemption request. CPWG began the project by attending a kick-off meeting with County staff to review the site topographic survey provided by Lake County, establish the project schedule, and review project criteria which would affect the design documents.

 

CATEGORIES

Parks & Recreation

SKILLS

Design: Civil Site

Permitting: Environmental Resource

Value Engineering

CPWG Engineers prepared construction documents associated with the floating dock, parking area, and restroom facility.  60%, 90%, 100% and final construction documents were submitted to the County for review and comment.  CPWG attended two design review meetings with County staff.  The final plan was provided to County staff for submittal of required County building permits or health department permits.  CPWG submitted the Environmental Resource Permit (ERP) documents to the St. Johns River Water Management District for permit/exemption request.  The final designed improvements included:

CPWG final design construction plans included:

  • 40 Foot Long Floating Dock
  • Prefabricated restroom (no water or sewer)
  • Paved Parking Area with one handicapped parking space
  • Approved SJRWMD Stormwater Permitting
CPWG Designed Astatula Park Boat Ramp

Astatula Park Boat Ramp Designed by CPWG Engineering