Archibald Memorial Park Beautification Project

Madeira Beach, FL
Archibald Memorial Beach Park Design by CPWG Engineering

CPWG's Enhanced the Archibald Memorial Beach Park Visitor Experience

  • Custom Designed Landscaping
  • Refurbishing Restroom Facilities
  • Well Lit Parking Lots
  • All Utilities Placed Underground
Increased Parking Space, Archibald Memorial Beach Park Design by CPWG Engineering

CPWG's Increased Parking Space

  • More Spaces for More Visitors
  • Automated Parking Meters
  • Custom Designed Parking Lot Lighting
  • Landscaped Parking Lot
Beach Walkovers, Archibald Memorial Beach Park Design by CPWG Engineering

CPWG Helped Reduce Beach Erosion

  • Beach Walkovers to Preserve Native Plants
  • Creating Stormwater Management Facilities
  • Placing Pavers at the Beach Showers
  • Eco-friendly, Sustainable Landscaping

 

CPWG Installed Specialized Turtle Lighting

CPWG Installed Specialized Turtle Lighting

During sea turtle egg-laying season the lights automatically change to create special lighting that leaves them in the dark but allows humans to see.

During the off-season, the lights automatically revert to white colored lights for improved illumination.

Snack Shack Concept, Archibald Memorial Beach Park Design by CPWG Engineering

CPWG Design for the Revitalized Snack Shack

The  design used bright colors, improved facilities and easy access routes to provide a welcoming destination for park visitors.

Completed Snack Shack, Archibald Memorial Beach Park Design by CPWG Engineering

The Completed Snack Shack

Archibald Park’s Snack Shack revitalized and ready to serve beach visitors.

 

Archibald Memorial Park Design

Madeira Beach, FL

CPWG Engineerings design for the Archibald Memorial Beach Park beautification project enhanced the functionality and visual appeal of the existing park by adding parking lots with beautiful lighting, landscaping, beach walkovers, automated parking meters, a dumpster facility, stormwater facilities, and pavers at the beach showers. The restroom facilities were refurbished to add to the convenience of park visitors. The utilities along Gulf Blvd were placed undergrounded to allow the park’s natural beauty to shine.

Project tasks included sustainably-driven conceptual planning, ecologically focused landscape design, value engineering, innovative green best management practices that were incorporated into the final design, bid assistance, and construction administration. Our team performed preliminary design; alternative analysis; and produced construction plans for the project landscaping, site civil, and irrigation. Our staff also prepared project specifications and special provisions for project bidding.

SKILLS

Bid Assistance

Construction Administration

Eco-Focused Landscape Design

Innovative Green Industry BMPs

Sustainability-driven Planning

 Value Engineering

Archibald Memorial Park, Madeira Beach, FL