CPWG received contracts in the City of Indian Rocks Beach, Redington Beach, and Redington Shores to underground utilities along Gulf Boulevard. The undergrounding project includes:

  • Undergrounding of Duke, Verizon and Bright House lines along Gulf Boulevard.

  • Lighting design and coordination w ith Duke, lighting design to be included with the Duke Permitted Plans

The project incorporates the following tasks:

  • Design Layout of Equipment on properties to Obtain Easements

  • Coordination with Utility Companies

  • Subsurface Utility Excavation (SUE)

  • Undergrounding Design Coordination and Plans Creation for Duke / Verizon / Bright House Network

  • Coordination with FDOT and local communities’

  • Field review to connect electric, phone, cable at homes/buildings

  • Utility Undergrounding

  • Construction Administration

 …More CPWG News

" data-link="https://twitter.com/intent/tweet?text=Placing+Utilities+Underground+Along+Gulf+Boulevard&url=http%3A%2F%2Fwww.cpwgengineering.com%2Fgulf-boulevard-utilities-underground%2F&via=">">Tweet
7 Shares